Site Engineer at the Ayla Project - New entrance
- Precast concrete pipe installation.
- H.D.P.E , P.V.C pipe installation.
- Walls building.
- Soak away building.
- Asphalt paving ways.
- Building ayla new gate.
- Laying curb stone.
- Interlock & facing block installation.
- Quantity Surv
2017 Jun - 2017 Oct
مهندس موقع وجودة و كميات
غزالة و حداد
Quality control and Site Engineer at the new port project
- Concrete repair works.
- Shotcrete Works.
- Write a progress report for the project.
- Quantity Surveyor .